References
Manufacturing and construction
Construction of Liebherr concrete mixing units at the Paks II site
Production of steel structures for a family house with on-site construction.
Production and on-site installation of a degassed feed water tank.
| Megrendelő | Date | Project | |
|---|---|---|---|
| Project Ganz EEG | Date 2023 | Project Manufacturing of steel structures for power plant water machines and processing. | Read More >> |
| Project Ganz Transzformátor- és Villamos Forgógépgyártó Kft. | Date 2023 | Project Production of steel structures for power plant motor housings. | Read More >> |
| Project Paks Nuclear Power Plant - Paks II construction site | Date 2023 | Project Construction of Liebherr concrete mixing units at the Paks II site | Read More >> |
| Project Ganz TVF Kft. | Date 2022 | Project Manufacturing of steel structures and power plant engine houses. | Read More >> |
| Project Halbo MCE Zrt. | Date 2022 | Project Production of industrial pipelines and steam distribution lines. | Read More >> |
| Project Nyergesújfalu | Date 2020 | Project Production and construction of a pressure pipeline (500 mm) with fittings in a flood zone. | Read More >> |
| Project DSS Technologies Kft. | Date 2020 | Project Production of automatic parking garage centralizing steel structure. | Read More >> |
| Project Nagytarcsa | Date 2020 | Project Production of steel structures for a family house with on-site construction. | Read More >> |
| Project Hungrana Kft. | Date 2016 | Project Production and on-site installation of a degassed feed water tank. | Read More >> |
| Project ArcelorMittal Zenica | Date 2015 | Project Steel structure reinforcement works and coal loading wagon's rail track replacement works at the No. 6 Coke Oven Battery in ArcelorMittal, Zenica | Read More >> |
| Project Pannónia Etanol Zrt. | Date 2014 | Project Large stainless steel construction manufacture. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2012 | Project Gantry rail repair | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2012 | Project Renovation of wastewater treatment plant | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2012 | Project Replacement of the recuperator in the hot rolling mill | Read More >> |
| Project | Date 2012 | Project DN2200mm nominal diameter pumps discharge elbows | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2012 | Project Replacement of DN700 pipeline in the industrial water network | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2012 | Project Renovation of the KE201A deacidificator at the Still-Claus plant of ISD Kokszoló Kft. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2012 | Project Tömörítői gyújtó kemencék felújítása és cseréje | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2011 | Project Design and construction of a heat recovery industrial water-tube boiler, with the steam capacity of 30t/h used in coke quenching plant no. I | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2011 | Project Replacement of 486 metres of coke oven gas pipes | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2011 | Project Renovation of the acid regeneration reactor furnace | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2011 | Project Development of the furnace gas scrubbing system | Read More >> |
| Project DAK Acélszerkezeti Kft. | Date 2011 | Project Galvanization plant maintenance | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2011 | Project Preservation of rough rolling devices at the hot rolling mill | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2011 | Project Disassembly of the rotating furnace lime works in the Steelworks unit | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2011 | Project Construction of fireproof walls to the heat treatment furnaces | Read More >> |
| Project Magyar Cukor Zrt. Kaposvár | Date 2011 | Project Lining repair | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2011 | Project Development of the furnace gas scrubbing system | Read More >> |
| Project Magyar Cukor Zrt. Kaposvár | Date 2011 | Project Repair of lining in the lime kiln shaft furnace used in the sugar industry | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2010 | Project Wagon tipper, mechanical renovation | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2010 | Project Design and construction of the modernised renovation of coke dry quenching unit no. 1-2 | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2009 | Project Reconstruction of the fireproof walls of the 1300 t pig iron mixer | Read More >> |
| Project DAK Acélszerkezeti Kft. | Date 2009 | Project Acid insulation maintenance works in the galvanizing plant | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2009 | Project Reconstruction of fireproof walls in the furnace workstations of the 35 bell furnaces in the roller temper plant of the cold rolling mill roller train. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2009 | Project Repair of Exhauster no. I. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2009 | Project Revision of railway network | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2009 | Project Renovation of the KE201A deacidificator at the Still-Claus plant of ISD Kokszoló Kft. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2009 | Project Planning, manufacturing, installation | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2009 | Project Repair of tar settling tank no. I. | Read More >> |
| Project Piecbud-Bytom S. A. Poland | Date 2008 | Project Piping works of the A and B coking blocks in the Radlin steelworks | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2008 | Project Planning and execution of demolishing four benzene towers | Read More >> |
| Project Corax-Bioner Zrt. | Date 2007 | Project Turnkey construction of biohydrogen and enzyme production plant | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2007 | Project Repair of tar settling tank | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2007 | Project Hot work repair at coking block no. I. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2006 | Project Renovation and replacement of hydraulic system in coking block no. III. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2006 | Project Renovation of coke grading plant no. II. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2006 | Project Complete repair of five coke oven gas pipeline pre-coolers at the gas condensation plant | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2006 | Project Renovation of dry quenching chamber no. V. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2005 | Project Performance of works required for restoring and restarting coking block no. II. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2005 | Project Repair of coking block no. I (with 56 chambers, H=4.3m, 366000 tonnes a year). | Read More >> |
| Project Kremikovci Kohászati Üzem Bulgária | Date 2005 | Project Blast furnace no. III, V=1033cbm, 2000 tonnes/day | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2005 | Project Blast furnace no. I, V=960 m3 | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2005 | Project Repair of coking block no. III | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2004 | Project Reconstruction of coking block no. III. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2004 | Project Reconstruction of coking block no. III. | Read More >> |
| Project DBK Donau | Date 2003 | Project Purchase and supply of coal and coke | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2002 | Project Repair of coking block no. III. | Read More >> |
| Project ISD Dunaferr Zrt. | Date 2002 | Project Reconstruction of coking block no. III (with 65 chambers, H=7m, 910000 tonnes a year). | Read More >> |